Deep shaft and underground mine dewatering
Lifting water out of a deep working is a head problem before it is a flow problem. The L295 reaches 295 m of total head at 988 m³/hr, and the L130 delivers 189 m at 340 m³/hr for smaller sections. Single-stage operation at these pressures reduces the number of wear points compared with a staged arrangement.