Construction site dewatering
Excavations, foundations and basement works accumulate groundwater and rainfall carrying sand, gravel and site debris. The B Series handles solids from 44 mm on the B100 up to 124 mm on the B400 without a separate strainer stage, which keeps a pump running through the conditions that block clean-water units. Self-priming to 8.5 m means the unit can be positioned at the excavation edge rather than lowered into it.